top of page
All Posts


Case Study - Steelwork condition survey
Our client requested a steelwork survey and condition report of the Heli-deck supporting structure. Rope Access was decided to be the...
Ferox Engineering
Jun 6, 20251 min read
Â
Â
Â


Case Study - Valve replacement
A client tasked Ferox Engineering with the replacement of several large ball valves on their critical pipework structure. Limited...
Ferox Engineering
Jun 5, 20251 min read
Â
Â
Â


Case Study - Crankshaft removal and installation
Our client came to us with the requirement of removing a large and highly sensitive 9 Ton crankshaft from a confined machinary space. In...
Ferox Engineering
Mar 12, 20251 min read
Â
Â
Â


Sheffield's Top Choice for Rope Access Construction and Fabrication Solutions
Are you in need of top-notch Rope Access construction and fabrication solutions? Look no further than the experts at Ferox Engineering....
Ferox Engineering
Mar 7, 20251 min read
Â
Â
Â
bottom of page
